Redevelopment of a Grade II* Listed nineteenth-century church to create a theological college
In 2010, work began on site at the Grade II* listed St Jude’s Church, to transform the building into a theological education centre. The £5m package included conservation and re-ordering of the worship area, new roof covering, new landscape treatment, and excavation and conversation of the existing undercroft. The works renovated the main worship space to create a multipurpose space for worship and lectures for up to 400 people.


The Building
Built between 1867-70 to designs by George and Henry Godwin, the building has a Kentish ragstone exterior with stone dressings, and central gables with three Decorated style windows.
In 2012 Hanslip & Co. (formerly HMDW Architects) completed a re-ordering of the building to accommodate the needs of five user groups: the congregation, principally to use on Sundays, St Mellitus College, to use it on weekdays, as well as the Community of St Jude, the Earls Court Project, and a Nursery School, also using the building throughout the week.






Designed for flexibility
Interventions to the ground floor were designed to allow for flexible use of the space and modern materials were used to offset against the complex and vibrant historic brickwork.
The glazed screen between nave and café can be folded open, allowing the seating area to be extended to the west end, as well as using the north and south galleries for their original purpose, when large gatherings are required. The ground floor can be used for worship for an increasing congregation or as a flexible space for college and hire use.
Formation of the basement
The basement development included full excavation of the crypt to more than 2m. Partly a mining exercise, the excavation allowed for the inclusion of two additional lecture theatres and several meeting rooms alongside separate facilities for the nursery school and Earls Court Project. The finishes define it as a modern and functional space.
Additionally, the recording studios in the basement allow the College to record and broadcast live footage from all three Lecture Rooms simultaneously on the internet.
The basement corridors, library and café have thick acoustically-absorbent ceiling panels (often in circular form to continue a theme that commenced with the coronas and extended into lighting elsewhere). Each of the volumes was studied acoustically at an early stage, with elements designed to moderate reverberation times.
The restored church building
The white and gold paint, long since turned grey, was removed throughout the building. The brickwork, along with the beautiful murals depicting the natural world (which feature in the roundels above the column capitals and in the arch reveals) are now a prominent feature of the interior, having been hidden for sixty years. Externally, new stone openings for windows and doors, and small ventilation louvres, have all been crafted to a high standard to fit naturally within the existing exterior.
Lighting to the main area was purpose-designed, with a series of coronas intended to allow uplights, downlights, theatrical lights, and even speakers to be able to be fitted at any time.
The restored church can now cater for Christian worship comprehensively, including popular, bustling Sunday services. The result has been applauded by the younger generation, for whom it is largely intended. Some five hundred students are involved in courses at St. Jude’s already.
St Mellitus College have produced a video, including footage of the Ground floor Cafe and Nave, the first floor Library, and a Basement Lecture room.
Project Information
Completion – 2015
Building Listing – Grade II*
Principal Contractor – Mansell Construction Services Ltd
Quantity Surveyor – Robert Lombardelli Partnership
Structural Engineer – Ellis & Moore
Services Engineer – Martin Thomas Associates
Acoustic Engineers – Sandy Brown Associates
Lighting Designer – Light Perceptions
Building Control – John Miller Partnership Ltd